TRADUguide

TRADUguide - Your Guide to Translators and Translation Agencies

For translators

Find a job  |   Conges terminology center  |   Agencies list  |   Feedback forum
Register as a freelance translator or an agency  |   My profile  |   My status
Become a featured member  |   Renew your featured membership

For job posters

Post a translation job to ask for quotes
Browse the translators directory
My account / My job postings

Home   |   This is how TRADUguide works   |   Contacts / Imprint

 

TRADUguide.com auf Deutsch

Conges terminology question

<<Previous question

All questions

Next question>>

176 months ago

Dr. Georg Schweigart  See profile asked this question:

Language pair:

English > German

Subject:

Medical

Level of diffculty:

Difficult / demanding

Word or term in question:

peritoneal spillage

Context:

Cystotomy • Caudal laparotomy • Pack off bladder to avoid peritoneal spillage

Keywords:

Surgery

 

Want to send the asker a comment? Click here.

Important This question has already been answered and rated. Therefore, no new answers can be given.

Complete list of answers and comments

176 months ago

  See profile wrote:

Bauchfellverschüttung - oder - peritoneale Verschüttung

176 months ago

  See profile wrote:

Peritonealerguss

My comment:

Also Austritt von Flüssigkeit in die Bauchhöhle

The asker rated this answer best

176 months ago

Medilingua Hungarica  See profile wrote:

Bauchfellmangel

My comment:

Es fehlt vermulich ein Stück vom Bauchfell (Peritonaeum). Ein "Lack" (E).
Das englische Wort bedeutet ursprünglich Produktionsausfall wegen Qualitätsabfall. Noch nie gehört!!!

My references:

Aus Wikipedia (E):
1) For the British audio recording term, see l e a k a g e (sound recording).
2) In industrial production, spillage is the loss of production output due to production of a series of defective or unacceptable products which must be rejected. Spillage is an often costly event which occurs in manufacturing when a process degradation or failure occurs that is not immediately detected and corrected, and in which defective or reject product therefore continues to be produced for some extended period of time.
Spillage results in costs due to lost production volume, excessive scrap, delayed delivery of product, and wastage of human and capital equipment resources. Minimization of the occurrence and duration of manufacturing spillage requires that closed-loop control and associated process monitoring and metrology functions be integrated into critical steps of the overall manufacturing process. The extent to which process control is complete and metrology is high resolution so as to be comprehensive determines the extent to which spillages will be prevented.

176 months ago

English-German Translations  See profile wrote:

Hervortreten des Bauchfells